Check the surface first

Identify the flooring and which protective materials suit it. Newly treated surfaces may have special requirements; follow the flooring manufacturer's or installer's advice. Do not apply unfamiliar adhesive film on the assumption that it will be harmless. Even tape described as removable is not suitable for every varnish or finish.

Sweep or vacuum the route before laying a covering. Trapped grains of grit can rub under pressure. Plan protection all the way to the intended setting-down area, including corners where furniture will turn. A small mat at the entrance does not protect the rest of the route.

Create a flat, continuous path

Choose a covering suitable for the floor and firm enough for the work, then lay it without loose folds. Joins and edges must not create trip points. Follow the product guidance for fixing materials compatible with both covering and floor. Check that doors can open and close fully. Adjust any covering that bunches up as a door moves.

Loose towels and thin blankets are not universal walking-route protection. In wet weather, pay particular attention to the entrance: replace or dry wet covering instead of hiding it under another layer. Keep cleaning equipment handy without leaving it in the transport path.

Check it as the move progresses

Assign someone to inspect the route regularly for shifted edges, moisture and dirt. Check particularly after moving heavy furniture or using dollies. Some coverings are unsuitable for small wheels carrying concentrated loads; change the covering or handling method if necessary.

Do not drag furniture simply because something protective is underneath. A floor covering does not replace appropriate handling. When the work is finished, remove it carefully and inspect the surface below. Remove any adhesive residue using a method suitable for that floor, rather than an arbitrary solvent from the toolbox. Let the cleared floor dry before placing rugs or furniture back over a damp area.

← Back to category